Julia Smit explains a cave specialist's job at Lewis and Clark Caverns, and the work to rewire the cave, contain core-drilling slurry, and replace old concrete, handrails and wire.
0:07 Hi, guys. My name is Julia Smit. I am the park ranger here at Lewis and Clark Caverns, during the year, anyway. Oh, awesome. I was going to set my own shut-up timer, but that's even better. When it is not summer, I do a lot of different things. This past year, I had a really rough time of it. Oh, yeah. Sorry, you guys are getting a reused presentation. Let's start with that one. If you want to see the whole thing, come back on May 25th, you can see the whole presentation. This is just a snippet. I'm gonna talk pretty fast, so I'll try to leave a couple minutes for questions. But y'all, I spent this winter as the cave specialist on the project. That is definitely the coolest job title I've ever had. No question about that. My job was varied. It ranged from answering the question, where does that hole go? Sometimes with the answer, will my head fit? I'll find out. It was also just monitoring the progress of the construction, making sure that the contractors, in a sensitive environment, facilitate their work, since it is such an extensive project in a weird environment, to provide expertise on the resource, say, hey, yeah, you can step on that rock, but not on that rock, that type of thing. I also was monitoring the bats and approving their methods, making sure that they were, again, adhering by those standards set for them.
2:04 Not sending particles airborne, not cutting into rocks they weren't supposed to cut into. So this lighting project was extensive. It's a complete lighting revamp that I don't think has ever happened in the history of the cave. Lighting system, some of it could date back as far as in the 50s or in the 70s, but it's pretty much been updated as needed. So this is completely replacing the power system. That power feeder cable, an inch and a quarter in diameter, a pound and a half per foot, and 2,200 feet of power feeder in the cave. In as short of sections as they could manage, but the longest section was 135 feet, and that's really unwieldy cable that you're having to drag through tight spaces in the cave. So big kudos to those construction workers. A lot of the members of the crew had never been in a cave before and now they're crawling around in some of the more challenging off-trail sections of our cave to do this project. So they've really got a crash course in caving and were able to work very safely in the cave. There's more than 11,000 feet of cable that powers all the light fixtures, which is a lot of cable. Even though that's lighter and more flexible, that's a lot.
3:39 And as we were replacing the handrails as well, to remove the old handrail segments, they had to drill out those posts. They're adding new posts, so drilling, core drilling 224 post holes in the cave. And as of next week, when the project wraps up, they're going to be more than about 970 feet of new lighting pods underneath, illuminate the path, make our tour a lot safer, which will be so nice for our visitors. I know that this crowd, if anyone knows what a challenge it is to make your way through a cave, this is an illustration of some of those squeezes modeled by the lovely Anna Christman. And some of those areas that the crew were having to get wires through were just tight, tight squeezes. And working with people who have never been in a cave before, a lot of reminders of how to move through that environment, reminders to slow down. For the most part, everyone did just an amazing job and didn't make me nervous at all. So that is great. But lots of signs like this throughout the cave. Reminders of slick stairs that our project manager put out.
5:15 Methods of working in a cave. Like I said, I had to approve the methods that they were using. One of the main first projects was core drilling and removing all those old handrail posts, putting in the new posts that were needed. So we went through a couple different iterations of what to do for this. The first one was just creating a dam of rags around the drill bit, sucking up the slurry of water and rock particles with a vacuum. This one wasn't approved. We're in a pretty open area here, far [inaudible] formations, but there was a lot of splatter that made its way onto the path and could have splattered up and hit formations if there were some nearby, which in many areas there are. So that was when I had to say, I don't think that's going to work, guys. Can we come up with something else? So Josh here, I don't know what his official job title is, but I think it might be BAM. He can fix anything, and he comes up with very creative solutions to problems. So he went to the hardware store. What you see here, this black thing on the drill bit, is not manufactured by Hilti at all. I think he said it's an adapter for a gutter system of some sort.
6:46 Don't really know, but it fit perfectly on that drill bit and helped direct the splatter down so that it could be vacuumed up. And then he has the end of the drill bit in a piece of PVC pipe there. The drill comes with an attachment with a little rubber seal around the base. The vacuum plugs right in, and it works really well on a flat level surface to contain any of that slurry that's running out. We have very few flat level surfaces in the cave. So he modified that, went and got some duct seal. So if anyone like me was not familiar with duct seal, it's pretty much like rubber cement. And he made like a snake of it, molded that to the rock around the drill bit to create a seal and then could vacuum up the slurry before it started draining off the path. So, really innovative solution. Just another view there. This is level ultimate challenge as far as core drilling goes. This is the section of the cave we call Backscratch Alley. These guys really know why. They were hunched over, bent in half, core drilling here for hours on end. This section was one that I was particularly nervous about because that picture of all the helictite soda straws from the beginning is feet away from where they're working.
8:21 So a very sensitive area of the cave that sustained a lot of damage in the past and we really wanted to make sure it didn't have any more damage. So they were working very hard to make sure and nothing was broken. So I'm really pleased with that. Here is one of the core samples. I have it over here on the counter. I also have a piece of the old electrical wire that has soda straw growing off of it. All of those things are going to be at my desk today. So if anyone wants to get an up-close look, I also have a core sample with part of the the rusted handrail still in it. So those are all things that, over the course of today, please come take a look. But yeah, very impressive. Even have some helictites still in that pocket. Next big challenge, pouring concrete, mixing concrete in a cave. The Montana Conservation Corps in the 1990s poured the concrete paths that we walk on today. They mixed their concrete right outside the cave, ran in with those buckets, dumped them out, ran back, mixed another bucket. At least that's what they told us. In order to make this process more efficient, they brought in a little tent, did all the mixing inside the tent.
9:53 Two people fit in, one with the vacuum, mixed that concrete up, on your way. The handrail design was a process I'm really glad I was not involved in. They did a 3D scan of the cave, so that's really cool, now that's something we have, and design the handrails painstakingly, giving knuckle room around formations, designing them so that they would guide people through the cave, helping you duck under overhangs, guiding in a way that having a post, a post and a straight rail between them would not have done. And they do have the light pods underneath. Again, a big undertaking to get big metal stainless steel pipes into the cave. Here's that same section from the mock-up put in place, clamped in place as they were fitting all this. This is how to make your cave specialist really nervous again. That Backscratch Alley section with eight people all hunched over, really tight, holding that handrail as they could get it dry fit. Here's a little, on Sunday, a look at what the new lighting [inaudible] Jason, Carl, Ian, Brian, for coming and helping with some of the demolition. That was another undertaking that I lost sleep over. Here you can see Carl down the pit in his natural habitat, on a rope.
11:25 Carl, I do have more pictures, but you just move so fast, you're a blur. They were very helpful in removing some of that old wire. Turns out when you leave rubber-coated wires for decades on end in water, they start to rot. So this is one of the wetter sections in the back of the Cathedral Room where they removed the wire, and the crew that was working to clean that up, shovel out some of that, because as the water continues to run down that flowstone, it picks up that nasty, nasty goo, spreads it all over the path back there and gets on everything. So we didn't want our wild [inaudible] to be tracking that through the cave. So we did shovel up that sludge, put some new clean dirt over the top, put out a rock over the path. So hopefully, as that continues to flow down, at least it won't be in an area where people are stepping on it. If anyone has ideas to completely remove it, I would love to hear it. But a lot of it's already thrown into the [inaudible]. [inaudible] just carries stuff like that out in hand. So, another creative solution: here is a ski bag that they would load sections of wire, rusty handrails, all sorts of different things into, to haul out by hand. We have three-quarters of a mile of passageways on our cave tour.
12:57 A lot of them have a lot of bending, twisting, navigating through, and the work crews did all of that. Sometimes carrying 10 feet of stainless pipe, sometimes carrying. This was my one goal with the lighting project. So I am happy. We were able to light some bacon so you can see the layers of minerals just with the lights. This is a terrible picture, but when you go through, you'll get a chance to see that. So come back, either take a tour. A lot of big changes on [inaudible]. Might have an ill-lit tunnel. Not a problem for me, I'm pretty short. But all of those are much better illuminated now. It's going to be a game changer as far as getting people safely through the cave.
13:55 Especially with people who understand the challenges of this environment. And we are so happy because we do have so much damage that we've had in the past in our cave. We still have many beautiful formations to share. This is a place where often it's someone's first time underground. And they can come in and get exposed to this environment in a way that shows them what damage humans can do to caves and also what beauty can be found in caves. So having this new lighting is just going to amplify that. We've gotten a lot of people into caving at this park, and we hope to do it in the future. So thank you.
Comments
Nobody has said anything yet. Were you on the trip, or in the room? Say what the talk leaves out, or put a time in your comment (like 23:10) and it becomes a link to that moment.